Go to the Sibenergomash site Go to the Alapaevsk metallurgy factory site Go to the MORSHANSKHIMMASH Go to the Trubmash site
Desing by Tessia Desing

News of the Group

3.05.2012
28.04.2012
26.04.2012
Next
 

New on the Group websites

2.04.2012
11.03.2012
17.02.2012
 

Manufacture

Since August 2009 the main plant asset of “NOVAEM” Group has been OAO ‘Sibenergomash” (Barnaul), an enterprise  specializing in designing and manufacturing of power-generating equipment for generating companies, oil and gas producing companies, oil refining and gas processing companies, enterprises of chemical, metallurgical and machine production.

 OAO “Sibenergomash” expands its presence in the market of industrial fans for power-generating companies and companies of metallurgical production. At present time the enterprise exercises leadership in this market due to its competitive strength.

 At present OAO “Sibenergomash” also prepares or bids for tenders with total volume of orders in the amount of 11 billion RUB in our country and abroad.

 In 2010 there took place a restart of vessels and welded steam drums production, which had not been functioning since 2006. It allows to expand the range of output products considerably and to enter the market of the equipment for enterprises of gas- and petrochemical complex.

 Forge & press shop, which had previously been frozen and which was inoperative for 5 years, is now prepared for putting into operation.

 The company possesses all the licenses necessary for its efficient work. In 2010 the company acquired a license for design engineering and manufacturing of the equipment for nuclear power facilities, which substantially expands a pool of eventual customers. OAO “Sibenergomash” was certified in theRepublicofBelarusfor manufacturing of the equipment for hazardous production facilities.

 In the second quarter of 2010 OAO “Sibenergomash” went through a quality management system audit.  The company received a recommendation for an issue of Quality Management System certificate of conformance to the requirements of international standard ISO 9001:2008. Certificate of occupational safety works conformance was received as well.

In2011 anew manufacture was mastered – a tube-welding mill was put into operation.

Its design capacity equals to 2500 tons of tubes per month.